Following today's time at Alex. we can now report that 87Z is being re-assembled and plans are that we should be able to have it back flying in a week or two.
 
The group that helped today ( Saturday ) concentrated on the Grob 103 and good progress was made opening up the seats and cleaning / lubricating the controls as well as polishing and waxing the top surfaces of the wings . Next Saturday we plan to dissassemble the Grob and work on the undersides of the wings and complete the fuselage and inspection of the control hookups etc.
 
After that we'll tackle the Blaniks and clean up 898 as well.
 
Come on out - the cold soon disappeared as we all got to do some rubbing / polishing. Hangar flying over lunch was great, and everyone was home by 2:30.
 
The Maintenance Crew.